Send Email
Send SMS
Search


Malaysia Exporter supplier Tank Erection System

ASTHA INFRA ENGG (I) PVT LTD manufactures it's products using High Quality, Durable Materials, in accordance with European Standards.Our products are ISO 9001:2015 and CE Certified.
We are the global leaders in manufacturing Retractable Tank Jacking System.
With over 16 years of experience in manufacturing and export, our jacking equipment are used to lift tanks globally.
Our equipment are 100% load tested before dispatch,however,On customers request,the load test can be witnessed by a Third Party Inspection agency like Bureau Veritas, SGS, Germanischer Lloyd or the like to maintain high quality export standard for Retractable Tank Jacking Equipment.

Tank Erection System

REQUEST CALLBACK

Tank Erection System
  • Tank Erection System
  • Tank Erection System
  • Tank Erection System
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 55,000 / UnitGet Latest Price

Product Details:
Effective climb100mm
Piston Dia120mm
Lifting & Lowering Capacity12MT, 18 MT

With our expertise in this domain, we are able to offer a superior quality range of Tank Erection System. We use the high-grade material in the fabrication process of these tank erection systems.

Yes! I am Interested

Hydraulic Tank Erection System

REQUEST CALLBACK

Hydraulic Tank Erection System
  • Hydraulic Tank Erection System
  • Hydraulic Tank Erection System
  • Hydraulic Tank Erection System
  • Hydraulic Tank Erection System
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 45,000 / UnitGet Latest Price

Product Details:
Voltage380V
ApplicationStorage Tank Construction
Power 2.2 kW

Specification:

DescriptionModel510-35D2510-40D2510-50D
 Working Capacity(metric tons)121825
 Standard arc distance between jacks (m)1.80 to 3.0
 Max plate height for which jacking equipments can be supplied (m)2.5 or 3.0 or more
Min plate height that can be used (m)1
  Min safe bearing capacity below trestle base plate (N/mm2)1.45
   Plate thickness range (mm)5 to 406 and above
 Unitary climb (cm/stroke)10
 Time per stroke (minutes)Approx 5
    Working pressure (kg/cm2)120135
Yes! I am Interested

Storage Tank Jacking System

REQUEST CALLBACK

Storage Tank Jacking System
  • Storage Tank Jacking System
  • Storage Tank Jacking System
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 45,000 / UnitGet Latest Price

Product Details:
Operating ModeAutomatic
MaterialStainless Steel
Capacity11-40 Ton

With Our Expertise In This Domain, We Are Able To Offer A Superior Quality Of Replacement Of Storage Tanks.jacking System Used World Over Usa, Latin America, South America, Europe, Cis, Africa, Middle–east, Australia, Asia ….. Storage Tanks Are Erected Globally Using Hydraulic Tank Jacking System. Along With This The Top Downwards Tank Erection Considerably Cuts Construction Time And Cost. As Most Work Is Done At The Ground Level Permitting Faster Erection Times Along With Reducing The Risk Of Accidents. Requires No Crane, Needs Lesser Manpower, Saves Money, Time, And Effort.
Yes! I am Interested

Tank Based Repair Service

REQUEST CALLBACK

Tank Based Repair Service
  • Tank Based Repair Service
  • Tank Based Repair Service
  • Tank Based Repair Service
  • Tank Based Repair Service
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 50,000 / UnitGet Latest Price

Product Details:
Minimum Order Quantity20 Unit
colororange

Tank Based Repair Of Hydraulic Tank Jacking sytsem
Replacing tank bottom plates and/or annular platesReplacing cathodic protectionRepairs to tank foundation in case of foundation settlementCorrecting tilt in tank as a result of foundation settlementReplacement of lowermost shell courseAddition of extra shell course / s to an existing tank

BENEFITS OF HYDRAULIC TANK JACKING SYSTEM.WELDING AT GROUND LEVEL

Since welding is done at ground level and not at heights, better quality is ensured and risk of accidents is “LOW”

SAFETY FIRST

Most work is done at ground level reducing risks of accidents. This is the safest and most preferred method for storage tank construction, discarding the need for a tall boom crane.

NO SCAFFOLDING REQUIRED

The jacking system dispenses with elaborate scaffolding requirements required to give access to welding at heights since now all welding is done at ground level.

FASTER ERECTION

New shell plates are to be erected ground level instead of being hauled up to about 30 heights or more saving precious construction time for alignment of plates. The time required lifting of men and material to heights is eliminated. Construction work is practically unaffected by or snow since most work is done under the of the tank itself.

JACKING SYSTEM USED THE WORLD OVER

USA, Latin America, South America, Europe, CIS, Africa, Middle–East, Australia, Asia Storage tanks are erected in practically every part of the world using Hydraulic jacking system. Along with this the top downwards tank erection considerably cuts construction time and cost. As most work is done at the ground level permitting faster erection times along with reducing the risk of accidents. Requires no crane, needs lesser manpower, saves money, time, and effort.

EASIER INSPECTION

Welding inspectors can now conduct ultrasonic or other non-destructive tests on welds at ground level, facilitating ease of inspection and hence better quality control. No more climbing up to precarious positions for welding inspectors!

 

LESSER MANPOWER

Work at ground level increases productivity thereby reducing required manpower.

Yes! I am Interested

Tank Jacking And Erection Jack

REQUEST CALLBACK

Tank Jacking And Erection Jack
  • Tank Jacking And Erection Jack
  • Tank Jacking And Erection Jack
  • Tank Jacking And Erection Jack
  • Tank Jacking And Erection Jack
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 52,000 / UnitGet Latest Price

Product Details:
ConditionNew

12 tons jack for steel tank erection with a calculation of seismic and wind loading.
Yes! I am Interested

Tank Erection Hydraulic Jacks Units

REQUEST CALLBACK

Tank Erection Hydraulic Jacks Units
  • Tank Erection Hydraulic Jacks Units
  • Tank Erection Hydraulic Jacks Units
  • Tank Erection Hydraulic Jacks Units
  • Tank Erection Hydraulic Jacks Units
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 53,000 / UnitGet Latest Price

  • Erection Safe: Even in the case of power pack failure, electrical power shutdown, or hose eruption. The tank is held in place and does not slip
  • Flexible: Equipment can be split for erection of smaller tanks or expanded to build larger tanks
  • Temperature: Reliable at minus 20 Celsius degrees, even less
  • Application: a) Tank construction, b) Dismantling tanks, c) Replacing annular plate or foundation repair, d) Expanding tank capacity by means of adding extra shell in the bottom.


Additional Information:

  • Pay Mode Terms: L/C (Letter of Credit),T/T (Bank Transfer)
Yes! I am Interested

Tank Erection System

REQUEST CALLBACK

Tank Erection System
  • Tank Erection System
  • Tank Erection System
  • Tank Erection System
  • Tank Erection System
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 53,000 / UnitGet Latest Price

Product Details:
Colororange

Available in different lifting capacities, these dependable jacking options support requirement of Tank Erection System and can be offered in lifting capacities of 8 tons, 12 tons, 25 tons and others.
Yes! I am Interested

Hydraulic Jacking System & Jacking Equipment

REQUEST CALLBACK

Hydraulic Jacking System & Jacking Equipment
  • Hydraulic Jacking System & Jacking Equipment
  • Hydraulic Jacking System & Jacking Equipment
  • Hydraulic Jacking System & Jacking Equipment
  • Hydraulic Jacking System & Jacking Equipment
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 69,800 / UnitGet Latest Price

Product Details:
Minimum Order Quantity25 Unit
ConditionNew
Colororange

ASTHA INFRA ENGG (I) PVT LTD manufactures its products using High Quality, Durable Materials, in accordance with European Standards. Our products are ISO 9001:2015 and CE Certified. We are the global leaders in manufacturing Hydraulic Tank Jacking System.With over 16 years of experience in manufacturing and export, our jacking equipment are used to lift tanks globally. Our equipment is 100% load tested before dispatch, however, At customer's request, the load test can be witnessed by a Third Party Inspection agency like Bureau Veritas, SGS, Germanischer Lloyd or the like to maintain a high quality export standard for Tank Lifting Equipment.

BENEFITS OF HYDRAULIC TANK JACKING SYSTEM.


WELDING AT GROUND LEVEL

Since welding is done at ground level and not at heights, better quality is ensured and risk of accidents is “LOW”

SAFETY FIRST

Most work is done at ground level reducing risks of accidents. This is the safest and most preferred method for storage tank construction, discarding the need for a tall boom crane.

NO SCAFFOLDING REQUIRED

The jacking system dispenses with elaborate scaffolding requirements required to give access to welding at heights since now all welding is done at ground level.

FASTER ERECTION

New shell plates are to be erected ground level instead of being hauled up to about 30 heights or more saving precious construction time for alignment of plates. The time required lifting of men and material to heights is eliminated. Construction work is practically unaffected by or snow since most work is done under the of the tank itself.

JACKING SYSTEM USED THE WORLD OVER

 

USA, Latin America, South America, Europe, CIS, Africa, Middle–East, Australia, Asia Storage tanks are erected in practically every part of the world using Hydraulic jacking system. Along with this the top downwards tank erection considerably cuts construction time and cost. As most work is done at the ground level permitting faster erection times along with reducing the risk of accidents. Requires no crane, needs lesser manpower, saves money, time, and effort.

EASIER INSPECTION

Welding inspectors can now conduct ultrasonic or other non-destructive tests on welds at ground level, facilitating ease of inspection and hence better quality control. No more climbing up to precarious positions for welding inspectors!

 

LESSER MANPOWER

 

Work at ground level increases productivity thereby reducing required manpower.



Additional Information:

  • Pay Mode Terms: L/C (Letter of Credit),T/T (Bank Transfer)
Yes! I am Interested

Hydraulic Tank Lift Jacks And Tank Jacking System

REQUEST CALLBACK

Hydraulic Tank Lift Jacks And Tank Jacking System
  • Hydraulic Tank Lift Jacks And Tank Jacking System
  • Hydraulic Tank Lift Jacks And Tank Jacking System
  • Hydraulic Tank Lift Jacks And Tank Jacking System
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 57,000 / UnitGet Latest Price

Product Details:
Minimum Order Quantity20 Unit
BrandAstha

Applications Of Hydraulic Jacking Systems And Equipments

* Building of field erected storage tanks.


* Increase in tank capacity by adding shell rings or courses.


* Repair or replacement of tank bottom plate.


*Repair to tank foundation.


* Erection of other circular structures such as reactor shields in nuclear power stations, etc.


* Largest diameter of tank erected using Hydraulic Jacking Systems / Equipments : 92 mtrs*

BENEFITS OF HYDRAULIC TANK JACKING SYSTEM.WELDING AT GROUND LEVEL

Since welding is done at ground level and not at heights, better quality is ensured and risk of accidents is “LOW”

SAFETY FIRST

Most work is done at ground level reducing risks of accidents. This is the safest and most preferred method for storage tank construction, discarding the need for a tall boom crane.

NO SCAFFOLDING REQUIRED

The jacking system dispenses with elaborate scaffolding requirements required to give access to welding at heights since now all welding is done at ground level.

FASTER ERECTION

New shell plates are to be erected ground level instead of being hauled up to about 30 heights or more saving precious construction time for alignment of plates. The time required lifting of men and material to heights is eliminated. Construction work is practically unaffected by or snow since most work is done under the of the tank itself.

JACKING SYSTEM USED THE WORLD OVER

 

USA, Latin America, South America, Europe, CIS, Africa, Middle–East, Australia, Asia Storage tanks are erected in practically every part of the world using Hydraulic jacking system. Along with this the top downwards tank erection considerably cuts construction time and cost. As most work is done at the ground level permitting faster erection times along with reducing the risk of accidents. Requires no crane, needs lesser manpower, saves money, time, and effort.



Additional Information:

  • Pay Mode Terms: L/C (Letter of Credit),T/T (Bank Transfer)
Yes! I am Interested

 
X


Explore More Products

Contact via E-mail
Contact via SMS
Astha Infra Engg.(India) Private Limited
S D Giri (Manager)
605, Techno Citi Building, Above IDBI Bank Mahape, Airoli,
Navi Mumbai - 400708, Maharashtra, India
Call Us: 
Call Response Rate: 55%
Share Us :
F G T L



Home  |   Profile   |  Products & Services  |  Site Map  |   Contact Us

© Astha Infra Engg.(India) Private Limited. All Rights Reserved (Terms of Use)
Developed and Managed by IndiaMART InterMESH Limited

Astha Infra Engg.(India) Private Limited