Send Email
Send SMS
Search


Jordan Exporter supplier tank Jacking System

ASTHA INFRA ENGG (I) PVT LTD manufactures it's products using High Quality, Durable Materials, in accordance with European Standards.Our products are ISO 9001:2015 and CE Certified.We are the global leaders in manufacturing Retractable Tank Jacking System.With over 16 years of experience in manufacturing and export, our jacking equipment are used to lift tanks globally.Our equipment are 100% load tested before dispatch,however,On customers request,the load test can be witnessed by a Third Party Inspection agency like Bureau Veritas, SGS, Germanischer Lloyd or the like to maintain high quality export standard for Retractable Tank Jacking Equipment.


Storage Tank Construction Jacking Equipment

REQUEST CALLBACK

Storage Tank Construction Jacking Equipment
  • Storage Tank Construction Jacking Equipment
  • Storage Tank Construction Jacking Equipment
  • Storage Tank Construction Jacking Equipment
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 57,000 / UnitGet Latest Price

Product Details:
Minimum Order Quantity20 Unit
Usage/ApplicationIndustrial
ColorRed
Dimensiontank jacking systems
I Deal InNew Only
Working Pressure120bar

Applications Of Hydraulic Jacking Systems And Equipments

* Building of field erected storage tanks.


* Increase in tank capacity by adding shell rings or courses.


* Repair or replacement of tank bottom plate.


*Repair to tank foundation.


* Erection of other circular structures such as reactor shields in nuclear power stations, etc.


* Largest diameter of tank erected using Hydraulic Jacking Systems / Equipments : 92 mtrs*

BENEFITS OF HYDRAULIC TANK JACKING SYSTEM.WELDING AT GROUND LEVEL

Since welding is done at ground level and not at heights, better quality is ensured and risk of accidents is “LOW”

SAFETY FIRST

Most work is done at ground level reducing risks of accidents. This is the safest and most preferred method for storage tank construction, discarding the need for a tall boom crane.

NO SCAFFOLDING REQUIRED

The jacking system dispenses with elaborate scaffolding requirements required to give access to welding at heights since now all welding is done at ground level.

FASTER ERECTION

New shell plates are to be erected ground level instead of being hauled up to about 30 heights or more saving precious construction time for alignment of plates. The time required lifting of men and material to heights is eliminated. Construction work is practically unaffected by or snow since most work is done under the of the tank itself.

JACKING SYSTEM USED THE WORLD OVER

 

USA, Latin America, South America, Europe, CIS, Africa, Middle–East, Australia, Asia Storage tanks are erected in practically every part of the world using Hydraulic jacking system. Along with this the top downwards tank erection considerably cuts construction time and cost. As most work is done at the ground level permitting faster erection times along with reducing the risk of accidents. Requires no crane, needs lesser manpower, saves money, time, and effort.



Additional Information:

  • Pay Mode Terms: L/C (Letter of Credit),T/T (Bank Transfer)
Yes! I am Interested

Hydraulic Lifting Jacks And Tank Jacking System

REQUEST CALLBACK

Hydraulic Lifting Jacks And Tank Jacking System
  • Hydraulic Lifting Jacks And Tank Jacking System
  • Hydraulic Lifting Jacks And Tank Jacking System
  • Hydraulic Lifting Jacks And Tank Jacking System
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 56,000 / UnitGet Latest Price

Product Details:
Minimum Order Quantity25 Unit
BrandAstha

Applications Of Hydraulic Jacking Systems And Equipments

* Building of field erected storage tanks.


* Increase in tank capacity by adding shell rings or courses.


* Repair or replacement of tank bottom plate.


*Repair to tank foundation.


* Erection of other circular structures such as reactor shields in nuclear power stations, etc.


* Largest diameter of tank erected using Hydraulic Jacking Systems / Equipments : 92 mtrs*

BENEFITS OF HYDRAULIC TANK JACKING SYSTEM.WELDING AT GROUND LEVEL

Since welding is done at ground level and not at heights, better quality is ensured and risk of accidents is “LOW”

SAFETY FIRST

Most work is done at ground level reducing risks of accidents. This is the safest and most preferred method for storage tank construction, discarding the need for a tall boom crane.

NO SCAFFOLDING REQUIRED

The jacking system dispenses with elaborate scaffolding requirements required to give access to welding at heights since now all welding is done at ground level.

FASTER ERECTION

New shell plates are to be erected ground level instead of being hauled up to about 30 heights or more saving precious construction time for alignment of plates. The time required lifting of men and material to heights is eliminated. Construction work is practically unaffected by or snow since most work is done under the of the tank itself.

JACKING SYSTEM USED THE WORLD OVER

 

USA, Latin America, South America, Europe, CIS, Africa, Middle–East, Australia, Asia Storage tanks are erected in practically every part of the world using Hydraulic jacking system. Along with this the top downwards tank erection considerably cuts construction time and cost. As most work is done at the ground level permitting faster erection times along with reducing the risk of accidents. Requires no crane, needs lesser manpower, saves money, time, and effort.



Additional Information:

  • Pay Mode Terms: L/C (Letter of Credit),T/T (Bank Transfer)
Yes! I am Interested

Hydraulic Tank Lift Jacks And Tank Jacking System

REQUEST CALLBACK

Hydraulic Tank Lift Jacks And Tank Jacking System
  • Hydraulic Tank Lift Jacks And Tank Jacking System
  • Hydraulic Tank Lift Jacks And Tank Jacking System
  • Hydraulic Tank Lift Jacks And Tank Jacking System
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 54,000 / UnitGet Latest Price

Product Details:
Minimum Order Quantity20 Unit
BrandAstha

Applications Of Hydraulic Jacking Systems And Equipments

* Building of field erected storage tanks.


* Increase in tank capacity by adding shell rings or courses.


* Repair or replacement of tank bottom plate.


*Repair to tank foundation.


* Erection of other circular structures such as reactor shields in nuclear power stations, etc.


* Largest diameter of tank erected using Hydraulic Jacking Systems / Equipments : 92 mtrs*

BENEFITS OF HYDRAULIC TANK JACKING SYSTEM.WELDING AT GROUND LEVEL

Since welding is done at ground level and not at heights, better quality is ensured and risk of accidents is “LOW”

SAFETY FIRST

Most work is done at ground level reducing risks of accidents. This is the safest and most preferred method for storage tank construction, discarding the need for a tall boom crane.

NO SCAFFOLDING REQUIRED

The jacking system dispenses with elaborate scaffolding requirements required to give access to welding at heights since now all welding is done at ground level.

FASTER ERECTION

New shell plates are to be erected ground level instead of being hauled up to about 30 heights or more saving precious construction time for alignment of plates. The time required lifting of men and material to heights is eliminated. Construction work is practically unaffected by or snow since most work is done under the of the tank itself.

JACKING SYSTEM USED THE WORLD OVER

 

USA, Latin America, South America, Europe, CIS, Africa, Middle–East, Australia, Asia Storage tanks are erected in practically every part of the world using Hydraulic jacking system. Along with this the top downwards tank erection considerably cuts construction time and cost. As most work is done at the ground level permitting faster erection times along with reducing the risk of accidents. Requires no crane, needs lesser manpower, saves money, time, and effort.



Additional Information:

  • Pay Mode Terms: L/C (Letter of Credit),T/T (Bank Transfer)
Yes! I am Interested

Hydraulic Tank Lifting Jacks And Tank Erection System

REQUEST CALLBACK

Hydraulic Tank Lifting Jacks And Tank Erection System
  • Hydraulic Tank Lifting Jacks And Tank Erection System
  • Hydraulic Tank Lifting Jacks And Tank Erection System
  • Hydraulic Tank Lifting Jacks And Tank Erection System
Get Best Quote

Thanks for Contacting Us.

Approx. Rs 55,000 / UnitGet Latest Price

Product Details:
Minimum Order Quantity25 Unit
BrandAstha
Colororange

Applications Of Hydraulic Jacking Systems And Equipments

* Building of field erected storage tanks.


* Increase in tank capacity by adding shell rings or courses.


* Repair or replacement of tank bottom plate.


*Repair to tank foundation.


* Erection of other circular structures such as reactor shields in nuclear power stations, etc.


* Largest diameter of tank erected using Hydraulic Jacking Systems / Equipments : 92 mtrs*

BENEFITS OF HYDRAULIC TANK JACKING SYSTEM.WELDING AT GROUND LEVEL

Since welding is done at ground level and not at heights, better quality is ensured and risk of accidents is “LOW”

SAFETY FIRST

Most work is done at ground level reducing risks of accidents. This is the safest and most preferred method for storage tank construction, discarding the need for a tall boom crane.

NO SCAFFOLDING REQUIRED

The jacking system dispenses with elaborate scaffolding requirements required to give access to welding at heights since now all welding is done at ground level.

FASTER ERECTION

New shell plates are to be erected ground level instead of being hauled up to about 30 heights or more saving precious construction time for alignment of plates. The time required lifting of men and material to heights is eliminated. Construction work is practically unaffected by or snow since most work is done under the of the tank itself.

JACKING SYSTEM USED THE WORLD OVER

 

USA, Latin America, South America, Europe, CIS, Africa, Middle–East, Australia, Asia Storage tanks are erected in practically every part of the world using Hydraulic jacking system. Along with this the top downwards tank erection considerably cuts construction time and cost. As most work is done at the ground level permitting faster erection times along with reducing the risk of accidents. Requires no crane, needs lesser manpower, saves money, time, and effort.



Additional Information:

  • Pay Mode Terms: L/C (Letter of Credit),T/T (Bank Transfer)
Yes! I am Interested

 
X


Explore More Products

Contact via E-mail
Contact via SMS
Astha Infra Engg.(India) Private Limited
SD Giri (Manager)
2304, Haware Info Tech Park , Vashi,
Navi Mumbai - 400708, Maharashtra, India
Call Us: 
Call Response Rate: 58%
Share Us :
F G T L



Home  |   Profile   |  Products & Services  |  Site Map  |   Contact Us

© Astha Infra Engg.(India) Private Limited. All Rights Reserved (Terms of Use)
Developed and Managed by IndiaMART InterMESH Limited

Astha Infra Engg.(India) Private Limited