Vashi, Navi Mumbai, Thane, Maharashtra
GST No. 27AALCA0343A1Z9
ASTHA INFRA ENGG (INDIA) PVT.LTD–We established in 2002 as Engineering Procurement & Construction Company In the field of Material handling, and Chemical processing equipment. The company is engaged in Design, development and Manufacture of a comprehensive range of equipment for all Process, Power generation, and associate industries. Hydraulic Jacking Systems & Aluminium Ingots is the pioneer and the oldest and leading Supplier AND Exporter of hydraulic jacking system / equipments for tank erection, & Slip-forming System, since 2002. Our manufacturing plant is in Mumbai. Each machine is quality checked and performance tested and carefully packed. We believe in first class customer service and are committed to building life-long relationship with customers.
We are the specialist in the construction of all kind of storage device like Clinker silo, Cement Silo, Fly ash silo, Overhead water tank and bridge pier Through Slip Forming System. We are the pioneer in the field of slip form Technology and working with the leading companies. We fabricate pressure vessel which is a closed container designed to hold gases or liquids at a pressure substantially different from the ambient pressure. Fabrication as an industrial term refers to building metal structures by cutting, bending, and assembling at our fabrication shop. Its continuous focus on innovation and expansion together with its commitment to quality and excellence has contributed significantly to the progress that the company has made over a short span of time. The 14-year-old Astha group is, today, uniquely poised to attain leadership position in its areas of operation. Astha Infra Engg (I) Pvt. Ltd. is the pioneer and the oldest, and leading Supplier AND Exporter of Hydraulic jacking system / equipments for tank erection andHydraulic Jacks for Erecting Grain Storagesince 2002. Our manufacturing plant is in India. Each machine is quality checked and performance tested and carefully packed. We believe in first class customer service and are committed to building life-long relationship with customers.
Approx. Rs 80,000 / UnitGet Latest Price
Product Details:Minimum Order Quantity | 25 Unit |
Color | orange |
Since welding is done at ground level and not at heights, better quality is ensured and risk of accidents is “LOW”
SAFETY FIRSTMost work is done at ground level reducing risks of accidents. This is the safest and most preferred method for storage tank construction, discarding the need for a tall boom crane.
NO SCAFFOLDING REQUIREDThe jacking system dispenses with elaborate scaffolding requirements required to give access to welding at heights since now all welding is done at ground level.
FASTER ERECTIONNew shell plates are to be erected ground level instead of being hauled up to about 30 heights or more saving precious construction time for alignment of plates. The time required lifting of men and material to heights is eliminated. Construction work is practically unaffected by or snow since most work is done under the of the tank itself.
JACKING SYSTEM USED THE WORLD OVER
USA, Latin America, South America, Europe, CIS, Africa, Middle–East, Australia, Asia Storage tanks are erected in practically every part of the world using Hydraulic jacking system. Along with this the top downwards tank erection considerably cuts construction time and cost. As most work is done at the ground level permitting faster erection times along with reducing the risk of accidents. Requires no crane, needs lesser manpower, saves money, time, and effort.
EASIER INSPECTIONWelding inspectors can now conduct ultrasonic or other non-destructive tests on welds at ground level, facilitating ease of inspection and hence better quality control. No more climbing up to precarious positions for welding inspectors!
LESSER MANPOWER
Work at ground level increases productivity thereby reducing required manpower.
Additional Information:
Approx. Rs 59,000 / UnitGet Latest Price
Product Details:Minimum Order Quantity | 25 Unit |
Color | Orange |
* Building of field erected storage tanks.
* Increase in tank capacity by adding shell rings or courses.
* Repair or replacement of tank bottom plate.
*Repair to tank foundation.
* Erection of other circular structures such as reactor shields in nuclear power stations, etc.
* Largest diameter of tank erected using Hydraulic Jacking Systems / Equipments : 92 mtrs*
BENEFITS OF HYDRAULIC TANK JACKING SYSTEM.WELDING AT GROUND LEVELSince welding is done at ground level and not at heights, better quality is ensured and risk of accidents is “LOW”
SAFETY FIRSTMost work is done at ground level reducing risks of accidents. This is the safest and most preferred method for storage tank construction, discarding the need for a tall boom crane.
NO SCAFFOLDING REQUIREDThe jacking system dispenses with elaborate scaffolding requirements required to give access to welding at heights since now all welding is done at ground level.
FASTER ERECTIONNew shell plates are to be erected ground level instead of being hauled up to about 30 heights or more saving precious construction time for alignment of plates. The time required lifting of men and material to heights is eliminated. Construction work is practically unaffected by or snow since most work is done under the of the tank itself.
JACKING SYSTEM USED THE WORLD OVER
USA, Latin America, South America, Europe, CIS, Africa, Middle–East, Australia, Asia Storage tanks are erected in practically every part of the world using Hydraulic jacking system. Along with this the top downwards tank erection considerably cuts construction time and cost. As most work is done at the ground level permitting faster erection times along with reducing the risk of accidents. Requires no crane, needs lesser manpower, saves money, time, and effort.
EASIER INSPECTIONWelding inspectors can now conduct ultrasonic or other non-destructive tests on welds at ground level, facilitating ease of inspection and hence better quality control. No more climbing up to precarious positions for welding inspectors!
LESSER MANPOWER
Work at ground level increases productivity thereby reducing required manpower.
Additional Information:
Approx. Rs 14.5 Lakh / PieceGet Latest Price
Product BrochureProduct Details:Minimum Order Quantity | 10 Piece |
Usage/Application | Industrial |
Material | steel |
Color | blue |
Dimension | 1600 mm lifting |
Type | Mechanical Jacking System for GLS Steel Bolted Tank |
I Deal In | New Only |
Working Pressure | not required 5 ton lode capacity |
Country of Origin | Made in India |
Hello,
We are the Astha group. We manufacture Tank jacking systems and lifting equipment for Bolted and welded Tank and Grain storage Silo Bin jacking systems. You can learn more about us at And you can always contact us if you need anything.Looking forward to working with you.
Additional Information:
Explore More Products
© Astha Infra Engg.(India) Private Limited. All Rights Reserved (Terms of Use)
Developed and Managed by IndiaMART InterMESH Limited